Powrmatic manuals

Powrmatic manuals pdf downloads

The air handling unit containing the air heater must permit the provision of a satisfactory flue system and an adequate air supply. The location must also provide adequate space for servicing.

 

Powrmatic pdf manuals

 

Powrmatic

Heaters not fitted with the concentric terminal and flue arrangement must have provision for the supply of combustion air. This air may be admitted through suitable grilles in the air handler casing into a space that connects directly with the combustion air entry socket on the heater. This space must be sealed and seperate from the airflow sections of the air handler.

Potterton boiler manuals

Potterton boiler pdf manuals for dowload here

In the event of an electrical fault after installation of the boiler, preliminary electrical systems checks must be carried out i.e. Earth Continuity, Short Circuit, Polarity and Resistance to Earth.

If the boiler is to be fitted in a run of kitchen units it is recommended that the boiler is fitted first or the adjacent units removed.

 

potterton pdf boiler manual

 

Potterton 

If the boiler is to be fitted under a worksurface, the worksurface may need to be removed to install the boiler. It is advisable that the worksurface be removable to allow access for servicing if required. If the boiler is to be fitted in a run of kitchen units it is recommended that the boiler is fitted first or the adjacent units removed.

Mesina manuals

Mesina pdf manuals to download

The fire may be fitted below a combustible shelf providing there is a minimum distance of 200mm above the top of the fire and the shelf does not project more than 150mm. If the shelf overhangs more than 150mm the distance between the fire and the shelf must be increased by 15mm for every 25mm of additional overhang over 150mm.

Mesina fires pdf download

Mesina

When fitting to conventional chimneys or 175mm flues it may be desirable to leave the flue restrictor baffle (supplied) in place to reduce the flue flow and increase the efficiency of the fire. Safe clearance of products must always be checked by carrying out a smoke match test as described.