Chaffoteaux and Maury boiler manuals

Chaffoteaux and Maury boiler manuals pdf download

The heater should be installed on a wall of flat non- combustible material that will not reverberate. Whatever the thickness of the wall, make a hole 305 mm (12 in) wide by 205 mm (8 in) high. If the hole is cut accurately there is no need to line it as the wall liner will seal off the cavity. A minimum clearance of 80 mm (3,2 in) should be left above the top edge of the wall opening. For dimensions and clearance see page 2 and Technical Data, page 3.

Slide the wall liner through the walI ensuring that is horizontal and that the flanged end is flush with the face of the inside wall. Trim to length if necessary, so that the outer end of the duct is flush with the face of the outside wall. Make good around the wall liner if necessary (fig. 1). N.B. : For walls of between 75-100 mm (3-4 in), turn the wall liner hooks down through 90”.

Remove the flue bend from the top of the heat exchanger by releasing the fling clip and removing the two screws. N.B. : If the optional top fixing bracket is to be spigot of the appliance in the wall liner, check that the appliance is vertical and mark the four or five fixing holes. Drill and plug the wall and fasten the top studs in position. These studs can be screwed into the wall by locking two nuts together on the parallel thread and using a spanner.

download the boiler manuals here now

Chaffoteaux and Maury boiler manuals-pdf download Chaffoteaux and Maury

Broag Remeha boiler manuals

Broag Remeha boiler manuals pdf

The Remeha Avanta Plus is a series of high-efficiency fully
condensing central heating boilers, for wall mounting, available
in the following types:
• Remeha Avanta Plus 24c, 28c, 35c and 39c – with integrated
domestic hot water system (Combi-type)
• Remeha Avanta Plus 18s, 24s, 30s
– without integrated domestic hot water system
(System-type)
fi g. 01 Remeha Avanta Plus
112952.LT.GB.W7H.001

These technical instructions contain useful and important information
for the correct installation, operation and maintenance
of the Remeha Avanta Plus combi and system boilers.

Read these instructions carefully before putting the boiler into
operation, familiarise yourself with their control functions and
operation, strictly observing the instructions given. Failure to
do so may invalidate warranty or prevent the boiler from
operating correctly.

The installation, commissioning, inspection and servicing of
the boiler must be carried out by a competent registered engineer
who holds valid ACS certification and in accordance with
current gas safety (installation and use) regulations, the building
regulations and all other relevant codes of practice.

All electrical work must be carried out by a competent engineer
and to be installed in accordance with the current IEE

Get the  pdf manual here download now

Broag Remeha boiler manuals-pdf download
Broag Remeha

Biasi boiler manuals

Biasi boiler manuals pdf download

To ensure efficient safe operation of the appliance it is necessary to carry out routine maintenance at regular intervals. The frequency of servicing will depend upon the particular installation conditions and the use to which the boiler is put, but, in general, once per year should be adequate. The following notes apply to the appliance but it should be remembered that attention must be also paid to the central heating and domestic hot water circuits with special attention to radiator valves, thermostats, clocks, leaking hot water taps etc. WARNING Before starting any servicing work, switch–off the electrical supply or disconnect the plug at the main isolating switch and socket (if a switch is used remove the fuse).

After any service on electrical components follow the instructions in the British Gas Multi Meter Book for preliminary electrical checks; in particular: earth continuity; polarity; resistance to earth. 5.2 Recommended routine maintenance The following procedures should be carried out at least once per year: 1 verify that the electrical connections, the flue pipework and the case are in good conditions; 2 inspect ventilation arrangements as explained in section 2.5 to ensure no alterations have been made since installation; 3 switch—off the electrical supply and remove the front panel of the case (section 6.2); 4 switch—on the electrical supply and run the boiler for few minutes in the d.h.w. mode; 5 check that the flame covers all the flame ports and is of alight blue colour.

Yellow flames and excessive lifting of flames indicate poor combustion.

Get the  pdf manual here download now


biasi boiler manual pdfBiasi boiler