Potterton boiler manuals

Potterton boiler pdf manuals for dowload here

In the event of an electrical fault after installation of the boiler, preliminary electrical systems checks must be carried out i.e. Earth Continuity, Short Circuit, Polarity and Resistance to Earth.

If the boiler is to be fitted in a run of kitchen units it is recommended that the boiler is fitted first or the adjacent units removed.

 

potterton pdf boiler manual

 

Potterton 

If the boiler is to be fitted under a worksurface, the worksurface may need to be removed to install the boiler. It is advisable that the worksurface be removable to allow access for servicing if required. If the boiler is to be fitted in a run of kitchen units it is recommended that the boiler is fitted first or the adjacent units removed.

Mesina manuals

Mesina pdf manuals to download

The fire may be fitted below a combustible shelf providing there is a minimum distance of 200mm above the top of the fire and the shelf does not project more than 150mm. If the shelf overhangs more than 150mm the distance between the fire and the shelf must be increased by 15mm for every 25mm of additional overhang over 150mm.

Mesina fires pdf download

Mesina

When fitting to conventional chimneys or 175mm flues it may be desirable to leave the flue restrictor baffle (supplied) in place to reduce the flue flow and increase the efficiency of the fire. Safe clearance of products must always be checked by carrying out a smoke match test as described.

Malvern boiler manuals

Malvern boiler pdf manuals to download

The boilers include a pump overrun device so it is essential that there is an open circuit for water to flow between the flow and return. In some system designs this may require the addition of a bypass, an automatic bypass is preferred.

Malvern boiler pdf manuals

 

Malvern

The Mains Water supply should be clean and able to produce the required flow rate, see Technical Data. New pipework must be flushed through before connecting. The appliance incorporates a strainer & flow regulator set at 8.5 l/min on the Cold Water mains inlet. The Inlet pressure should not exceed 10 bar, a reducer should be fitted if it does.