Ferroli boiler manuals

Ferroli boiler manuals pdf download

The Domina N 80 DGT is defined as a “room sealed” combination boiler, all air required for combustion is taken from outside the room in which it is installed. It is a new high performance gas fi red heat generator for central heating and domestic hot water production.

A special feature of this boiler is its built-in electronic flame ignition and control unit making burner operation completely automatic and safe. The main components are as follows: • Copper heat exchanger consisting of three finned tubes specifically shaped for high efficiency. • There are three copper coils inserted in the three heating circuit tubes. These represent the domestic hot water heat exchanger.

Their shape and high exchange surface area enable the full output of the boiler to be absorbed. • Ceramic fibre insulated combustion chamber • 12 stainless steel bladed burners specifically designed for this boiler. • Fan for discharge of combustion products and intake of combustion air. • Differential air pressure switch. For safety reasons, this ensures the burner ignites only when the fan is functioning correctly. • Hermetically sealed compartment made from corrosion-resistant steel enclosing the above components. • Combination gas safety valve with modulator, complete with pressure stabiliser. • Flowmeter giving the domestic hot water circuit precedence over the central heating circuit. • Pressure relief valve for the central heating circuit set to open at 3 bar. • Built-in Expansion vessel. • Variable speed pump. • Central heating flow temperature adjustment thermostat. • Domestic hot water flow temperature adjustment thermostat. • Central heating limit thermostat. • Overheat safety thermostat. • Electronic control unit for automatic flame ignition and control. • Central heating low water pressure cut off switch. • Domestic hot water flow temperature sensor.

download your pdf manuals from here now

Ferroli boiler manuals-pdfFerroli boiler

Eco Hometec boiler manuals

Eco Hometec boiler manuals pdf download

The installation of this appliance must be carried out by a competent person in accordance with the relevant Gas Safety Regulations (as amended), Building Regulations, Model Water Bylaws and the Building Standards (Scotland) Regulations.
Eco hometec shall not be responsible for any damage or loss resulting from failure to carefully observe the instructions given. The boiler, except for commissioning purposes, should not be left operating without the casing being attached and firmly secured.

Please read this manual thoroughly before commencing installation. The installation must be carried out in accordance with the manual otherwise the warranty will be void. Please read this manual thoroughly before commencing installation. The installation must be carried out in accordance with the manual otherwise the warranty will be void

boiler manuals pdf download it here now

Eco Hometec boiler manuals-pdf ECO Hometec

Chaffoteaux and Maury boiler manuals

Chaffoteaux and Maury boiler manuals pdf download

The heater should be installed on a wall of flat non- combustible material that will not reverberate. Whatever the thickness of the wall, make a hole 305 mm (12 in) wide by 205 mm (8 in) high. If the hole is cut accurately there is no need to line it as the wall liner will seal off the cavity. A minimum clearance of 80 mm (3,2 in) should be left above the top edge of the wall opening. For dimensions and clearance see page 2 and Technical Data, page 3.

Slide the wall liner through the walI ensuring that is horizontal and that the flanged end is flush with the face of the inside wall. Trim to length if necessary, so that the outer end of the duct is flush with the face of the outside wall. Make good around the wall liner if necessary (fig. 1). N.B. : For walls of between 75-100 mm (3-4 in), turn the wall liner hooks down through 90”.

Remove the flue bend from the top of the heat exchanger by releasing the fling clip and removing the two screws. N.B. : If the optional top fixing bracket is to be spigot of the appliance in the wall liner, check that the appliance is vertical and mark the four or five fixing holes. Drill and plug the wall and fasten the top studs in position. These studs can be screwed into the wall by locking two nuts together on the parallel thread and using a spanner.

download the boiler manuals here now

Chaffoteaux and Maury boiler manuals-pdf download Chaffoteaux and Maury