In the event of an electrical fault after installation of the boiler, preliminary electrical systems checks must be carried out i.e. Earth Continuity, Short Circuit, Polarity and Resistance to Earth.

If the boiler is to be fitted in a run of kitchen units it is recommended that the boiler is fitted first or the adjacent units removed.

 

potterton pdf boiler manual

 

Potterton 

If the boiler is to be fitted under a worksurface, the worksurface may need to be removed to install the boiler. It is advisable that the worksurface be removable to allow access for servicing if required. If the boiler is to be fitted in a run of kitchen units it is recommended that the boiler is fitted first or the adjacent units removed.

Malvern boiler manuals

Malvern boiler pdf manuals to download

The boilers include a pump overrun device so it is essential that there is an open circuit for water to flow between the flow and return. In some system designs this may require the addition of a bypass, an automatic bypass is preferred.

Malvern boiler pdf manuals

 

Malvern

The Mains Water supply should be clean and able to produce the required flow rate, see Technical Data. New pipework must be flushed through before connecting. The appliance incorporates a strainer & flow regulator set at 8.5 l/min on the Cold Water mains inlet. The Inlet pressure should not exceed 10 bar, a reducer should be fitted if it does.

Keston boiler manuals

Download Keston boiler manual pdfs

To ensure continual safe and efficient operation and to maintain product warranties it is a requirement that the appliance is checked and serviced at least once per year. It is the law that any servicing must be carried out by a competent person. Removal of the appliance cabinet by anyone other than a competent person will automatically invalidate the appliance warranty. Clearances If fixtures are to be positioned close to the boiler, the following minimum clearances must be observed: Top 150mm, Left 5mm, Right 5mm, Base 100mm, Front 305mm. Extended clearance is required to the front for servicing.

Keston boiler manuals pdf for download here now

 

KESTON boiler manual-pdf

Keston

During normal operation the digital display will dhow the current boiler temperature and will show a “.” In the lower right corner of the display when the burner is alight. If the green lamp near the CH or DHW+ – keys is illuminated the boiler is receiving a demand for that function. If the green lamp is flashing the boiler is either up to temperature or shutting down following removal of the CH or DHW demand.